Configuration Guide Vol. 1


16.3.3 Checking the power saving functionality status

<Structure of this section>

(1) Checking the Power Saving Schedule

Using the show power-control schedule operation command, you can check the current power control status and the power control schedules you have set up. The following example shows five schedules set for April 1, 20XX or thereafter.

Figure 16-6: Checking the power saving schedule
> show power-control schedule XX0401 count 5
Date 20XX/04/01(Thu) 18:36:57 UTC
Current Schedule Status : Disable
Schedule Power Control Date:
  20XX/04/01(Thu) 20:00 UTC  -  20XX/04/02(Fri) 06:00 UTC
  20XX/04/02(Fri) 20:00 UTC  -  20XX/04/05(Mon) 06:00 UTC
  20XX/04/05(Mon) 20:00 UTC  -  20XX/04/06(Tue) 06:00 UTC
  20XX/04/06(Tue) 20:00 UTC  -  20XX/04/07(Wed) 06:00 UTC
  20XX/04/07(Wed) 20:00 UTC  -  20XX/04/08(Thu) 06:00 UTC
>